Home » Case Studies » Distillery | AnMBR for sustainability and energy recovery
Location: Glenmorangie Distillery. Tain, Scotland
OEM: Aquabio Ltd.
Application: AnMBR
Capacity: 467 m3/day (expanded to 600 m³/day)
COD Feed: Average 30,000 mg COD/L
Membrane: 8 mm, PVDF, backwashable
Whisky production generates highly concentrated organic wastewater with variable characteristics, requiring careful flow management, process stability, and consistent treatment performance. Glenmorangie needed a solution that could accommodate a peak AnMBR treatment volume of 467 m³/day, with capacity for future expansion to 600 m³/day, and manage a design COD load of 14,527 kg/day.
Beyond regulatory compliance, the distillery wanted to reduce operational costs by using recovered biogas as low-cost energy for the whisky-making process. The treatment plant therefore had to combine high COD and BOD removal, flexibility under variable operating conditions, and a high degree of automation with remote monitoring.
Aquabio delivered a turnkey mechanical and electrical solution commissioned in Autumn 2016. The plant includes inlet works, screening, balance and divert tanks, an anaerobic bioreactor, a low-energy tubular ultrafiltration system, and a biogas energy management system with a biogas boiler. The system is fully automated and equipped for remote monitoring, enabling stable operation and efficient process control.
The distillery effluent is pretreated using a 0.25 mm wedge wire rotary drum before passing through a monitoring tank fitted with probes for pH, ORP, and temperature. In-spec wastewater is directed to two 150 m³ equalization tanks, while out-of-spec streams are diverted to a 140 m³ tank and gradually blended back into the process to protect downstream anaerobic treatment.
Feedwater is heated to 35–40 °C before entering a 2,100 m³ anaerobic reactor. Waste heat from the distillery supports both reactor and feedstock heating. The reactor mixed liquor is jet-mixed, and the generated biogas is cleaned and combusted in a biogas boiler. Biological sludge is treated in a sidestream tubular UF system comprising four loops of seven 10-inch, 4 m Berghof membrane modules, allowing membrane loops to be brought online or offline according to influent flow.
The AnMBR plant achieved the project’s overall performance targets, removing more than 95 % of influent COD and at least 98 % of BOD. It generates approximately 8,000 Nm³ of biogas per day, producing around 2,500 kg/h of steam and covering approximately 20 % of the energy demand of the whisky-making process. Treated UF permeate is safely discharged into the Dornoch Firth under license, while the nutrient-rich residual solid stream is reused locally as fertilizer for grassland fields.
| Parameters | Required Effluent |
|---|---|
| Capacity | 467 m³/day (expanded to 600 m³/day) |
| Design COD load | 14,527 kg/day |
| COD removal | ≥ 95 % |
| BOD removal | ≥ 98 % |
| Biogas generation | 8,000 Nm³/day |
| Steam generation | 2,500 kg/h (F + A) |


Discover how AnMBR technology turns high-strength distillery wastewater treatment into an opportunity for biogas production, energy recovery, and greater sustainability.

This case study shows how an MBR system enables efficient wastewater treatment and water reuse in food & beverage production, ensuring stable performance and high-quality effluent despite fluctuating loads.

High-strength, variable dairy wastewater from multiple milk processing plants is efficiently treated using a combined AnMBR and MBR approach.